Sanitary Sewer Collection Works (Arabic)
6,306.30 EGP
Description
Learn How to Design a sanitary sewer collection works from basics to expert to handle a full study for a project includes various design standards & Peak equations through five case studies:
1. One Peak Equation Project (Includes 1 ps & trans line)
2. Multiple Peak Equations for the same activity
3. Seperated sanitary collection works( 2 (1. grey 2. black))
4. Transmission Line with high Three Points (Special Case)
5. Property House Connection
6. BOQ & Report






Reviews
There are no reviews yet.