BIM for Infrastructure (Arabic)
Original price was: 55,000.00 EGP.41,250.00 EGPCurrent price is: 41,250.00 EGP.
Description
Highway
Tunnels
Bridges
Survey
Wet & Dry Utilities
Pumpstations
4D analysis
55,000.00 EGP Original price was: 55,000.00 EGP.41,250.00 EGPCurrent price is: 41,250.00 EGP.
Highway
Tunnels
Bridges
Survey
Wet & Dry Utilities
Pumpstations
4D analysis




Reviews
There are no reviews yet.